百色水利枢纽碾压混凝土主坝6A^#坝块内部观测设计  

The inner observation design for the 6A# block of the main rolled concrete dam of the Baise multi-purpose dam project

在线阅读下载全文

作  者:杨夏[1] 

机构地区:[1]广西水利电力勘测设计研究院,广西南宁530023

出  处:《广西水利水电》2004年第1期24-26,共3页Guangxi Water Resources & Hydropower Engineering

摘  要: 针对百色碾压混凝土主坝的内部观测设计,从安全监测设计的总原则出发,确定重点监测断面,并阐述了6A#坝块的坝基变形监测、裂缝监测、总压力监测、应力应变监测、渗压监测、温度监测,通过近期的施工期观测资料表明,目前埋设的所有观测仪器均处于正常工作状态,同时指出施工中应注意的问题。In view of the inner observation design of the main rolled concrete dam of the Baise multi-purpose dam project, determined the important observation section for safe observation, discussed the dam foundation deformation monitoring, crack and pressure monitoring, etc. The observation data proved that the all observation facility been buried were in former state and the problems should be paid attention in construction term also be pointed out here.

关 键 词:碾压混凝土主坝 安全监测 变形 裂缝 渗压监测 百色水利枢纽 

分 类 号:TV698.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象