检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:康乳国[1] 时海[1] 张宠宠[1] 解建平[2] 汤业鑫[2] 顾德俊[3] 许青[3]
机构地区:[1]宝钢集团企业开发总公司建筑维修公司,上海201900 [2]宝钢股份公司热轧厂,上海200941 [3]宝钢工程技术有限公司设计研究院,上海201900
出 处:《宝钢技术》2004年第1期10-13,32,共5页Baosteel Technology
摘 要:热轧电气室空调需要全年供冷。冬季采用冷却塔代替冷水机组直接为空调供冷水的节能措施 ,在宝钢股份自备电厂 (采用闭式冷却塔 )的水系统已经成功运行 2年 ,效益显著。主要介绍了开式冷却塔水系统节能措施改造的技术难点、解决方法、试验效果以及进一步完善方案。Air conditioners in hot rolling electricity room need cooling water all year round.It is an energy-saving method to supply cooling water directly by the cooling column instead of the traditional chiller.The new system (using cooling column) has successfully run for 2 years in Baosteel self-provided power plant,and has achieved obvious economic effect.Technical difficulties,solutions and test results in energy-saving technical transformation of the open cooling column system are mainly introduced with the project further perfected.
分 类 号:TB657[一般工业技术—制冷工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222