抽水蓄能发电机组背靠背启动的研究  被引量:3

Investigation of Back to Back Starting of Pumped Storage Hydraulic Generating Unit

在线阅读下载全文

作  者:邓玉章 

机构地区:[1]东方电机股份有限公司,四川德阳618000

出  处:《东方电气评论》2004年第1期15-19,共5页Dongfang Electric Review

摘  要:研究分析抽水蓄能发电机组的背靠背启动。列举模型和现场实测结果,并与希腊一家电厂的实例进行对比,分析影响该种启动的主要参数,得出了该过程的有关物理规律;还特别讨论了励磁和导叶开启过程的影响,以及驱动电机的转矩-转速特性曲线,揭示了正确选择确保启动成功的主要参数的方法。In the present paper,the procedure of back to back starting of pumped storage hydraulic generating unit is investigated and analyzed.The results from simulation as well as from real on site measurements are presented and compared for a case study of a Greek power station.Main parameters influencing this phenomenon are analyzed,and information is given on the physical laws underlying the process.In particular,the effects of excitation and gate valve opening procedure are discussed,along with the torque speed characteristic of the driving machine.Guidance is developed for the proper selection of the main parameters for a successful start.

关 键 词:水轮发电机组 励磁绕组 阻尼绕组 励磁电流 推力轴承 抽水蓄能电站 

分 类 号:TM312[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象