检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:毛剑锋[1] 马仁明[2] 傅正财[1] 余存仪[1] 郁祖培[2]
机构地区:[1]上海交通大学电气工程系,上海200030 [2]华东电力试验研究院,上海200437
出 处:《华东电力》2004年第3期43-45,共3页East China Electric Power
摘 要:带短线路的直流背靠背输电系统在跨国联网输电中有着重要意义。介绍了以电磁暂态程序ATP EMTP和EMTDC为计算工具、建立计算模型、分析东南亚某两国之间一条带有短线路的"背靠背"±300kVHVDC输电线路的全电压起动过电压的模拟计算情况。模拟结果显示,全电压起动过电压达到1 8pu,和传统的背靠背线路相比,这种线路的全电压起动过电压更高;和长线路相比,其过电压也比长线路的略高。模拟计算结果对我国今后的跨国联网输电线路的建设和运行具有一定的参考价值。Back-to-back HVDC systems with short transmission lines are widely used in international networking of power systems between countries.The full-voltage-starting overvoltages of a 'back-to-back' ±300 kV HVDC transmission line between two southeast Asian countries are analyzed in this paper.A computational model of the system is created,and the ATP-EMTP and EMTDC software is employed as computational tools.The results show that the overvoltages will rocket to 1.8 pu., which is higher than that of traditional back-to-back transmission systems.some factors that affect the overvoltages are also discussed.The results could provide for reference in the operation of HVDC networking transmission systems.
关 键 词:HVDC 联网输电系统 电压启动 过电压 电磁暂态程序 高压直流输电系统
分 类 号:TM721.1[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28