项目融资费用分担及联合支付进度问题研究  被引量:12

A Study on Allocation of Financing Costs and Joint Payment Schedule of Projects

在线阅读下载全文

作  者:何正文[1] 徐渝[1] 朱少英[1] 

机构地区:[1]西安交通大学管理学院,陕西西安710049

出  处:《系统工程》2004年第3期15-19,共5页Systems Engineering

基  金:国家自然科学基金资助项目 (5 9990 4 70 - 4 ) ;山西省软科学研究项目 (0 31 0 4 7- 4 )

摘  要:首先对研究所用到的符号进行定义 ,随后讨论项目融资费用分担及合同双方收益问题 ,在此基础上构建一个由两个优化模型组成的项目联合支付进度数学模型 ,通过求解该模型可以得到使双方联合收益最大化且按商定比例分担项目融资费用的支付进度安排 。The denotations used in the paper are defined firstly. Then the problems of financing costs allocation and profits of the two parties' of contracts are discussed. On the basis of the results achieved, the mathematic model of project joint payment schedule composed of two optimal models is constructed, and by solving this model the payment schedule which can maximize project joint profits and allot financing costs according to the ratio agreed by contractor and client may be obtained. Ultimately, the outcomes of the paper are illustrated by an instance.

关 键 词:项目融资费用 项目联合支付进度 数学模型 目标函数 优化模型 

分 类 号:F224.5[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象