机构地区:[1]黑龙江省电力勘察设计院,黑龙江哈尔滨150010
出 处:《黑龙江电力》2004年第2期149-150,153,共3页Heilongjiang Electric Power
摘 要:采用中国电力科学研究院EMTP程序,分析了220kV两相不平衡运行的电气化铁路系统发生单相及两相接地时,故障相和非故障短路电流分布规律,并对其进行了量化比较。指出,输电线路在两相供电运行方式下,其最大短路电流出现在输电线路末端两相接地时,其电流有效值与三相供电方式下的末端单相接地时短路电流有效值接近。Quantative analysis and comparison were made using China Electric Power Research Institute EMTP program with faulty and non-faulty phase short-circuit current distributions while single or two phase earthing occurred in the electrified railway system during 220 kV two-phase unbalanced operation.It is pointed out that in the two-phase power sapply mode,the maximum short-circuit current of power supply lines occures when the ends of power supply lines are two-phase earthed,and the valid value of its current is close to the valid value of short-circuit current while the ends in the three-phase power supply mode are single-phase grounded.
分 类 号:TM713[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222