机构地区:[1]黄河水利委员会,河南郑州450003 [2]黄河水利委员会防汛办公室,河南郑州450003
出 处:《人民黄河》2004年第4期13-14,共2页Yellow River
摘 要:回顾了2003年河南兰考蔡集工程的抢险过程及用料情况,提出了以下几点认识和建议:①落实责任制是做好防汛工作的保证;②必须加快二级悬河的治理步伐;③优化小浪底水库调度方式,发挥小浪底水库的长期防洪效益;④加大机动抢险队建设力度;⑤建设完善的防汛抢险道路体系;⑥适当配备水上应急抢险设备;⑦总结推广少抢险型的防洪工程;⑧制定黄河下游滩区综合治理规划,加快建设步伐;⑨工程建设要充分考虑当年的河势变化和发展;⑩制定切实可行的后勤保障预案。The paper reviews the rush repair process and materials use of Caiji works in Lankao of Henan in 2003 and puts forward the following understandings and suggestions: ① Implementing responsibility system is the guarantee for flood control; ② Quickening the management of secondary suspended river; ③ Optimizing the regulation mode of the Xiaolangdi Reservoir and playing the role of long-term flood control benefits of the reservoir; ④ Increasing the momentum of establishment of rush repair teams; ⑤ Establishing a completed road system for flood control and rush repairs; ⑥ Properly outfitting water emergency rush repair equipment; ⑦Summarizing and popularizing flood control works of less rush repair type; ⑧ Working out an overall plan for floodplain management of the lower Yellow River and speeding up the construction; ⑨ Fully considering the changes and development of river regime of the same year during engineering construction and; ⑩ Working out a feasible plan of logistic guarantee.
关 键 词:黄河 2003年 二级悬河 小浪底水库 防洪工程 防汛抢险
分 类 号:TV871.3[水利工程—水利水电工程] TV882.1
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145