三峡工程碾压混凝土围堰施工若干重大技术问题研究  被引量:2

Research of the key techiques for roller compacted concrete cofferdam in Three Gorges Project

在线阅读下载全文

作  者:曹广晶[1] 钟登华[1] 胡程顺[1] 

机构地区:[1]天津大学建筑工程学院

出  处:《水力发电学报》2004年第2期79-82,共4页Journal of Hydroelectric Engineering

摘  要:本文系统地介绍了三峡工程中的关键项目之一碾压混凝土围堰施工过程中若干重大技术问题的研究成果。这一项目工期紧、施工强度大、技术要求高 ,施工采用全断面摊铺碾压、不间断连续上升方式 ,创造了最高月强度 47 6万m3,最高日强度 2 1万m3,最高小时强度达到 12 65m3等多项碾压混凝土施工史上的新纪录。The research results of the key techniques for roller compacted concrete(RCC) cofferdam construction of the Three Gorges Project(TGP) are presented in this paper.The RCC cofferdam construction of TGP was featuring tight schedule,high intensity and strict technical requirements.By means of full face spreading roller compaction,the RCC cofferdam grew up in a continuous manner with a number of records in the history of RCC construction,such as monthly pouring record of 476,000m\+3,daily record of 21,000m\+3 and hourly record of 1,265m\+3.The research result of RCC cofferdam construction of TGP may be available for the references to other similar projects.

关 键 词:水利工程施工 关键技术 三峡工程 碾压混凝土 围堰施工 

分 类 号:TV52[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象