检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张宪[1]
机构地区:[1]铁三院电信处
出 处:《铁路通信信号工程技术》2004年第1期27-28,18,共3页Railway Signalling & Communication Engineering
摘 要:秦沈线山海关至锦州南段多为丘陵地区,路堑较多,路堑地段,部分地区出现弱场区现象。为使路堑地段弱场区的场强覆盖达到良好效果,增设了太阳能直放站。考虑到首次在铁路应用,为减少失误造成的危害,在保证工程工期的前提下采取先试验后推广的方式进行。在秦沈客运专线典型地点 K113~K115进行了试验。Most parts of Shanhaiguan-Jinzhou South section of Qin-Shen Passenger Line is located in hilly land area with many cuts,and part area of the cut sections is in feeble field conditions. The solar repeaters are added so that field strength coverage of feeble field becomes perfect in the cut sections.In order to reduce harms the fault would cause in case of its first application in railway,the mode is taken to carry out the test first and spread it later under the precondition of ensuring the time schedule of a project.The test is carried out in the typical place K113-K115 of Qin- Shen Passenger Line.
关 键 词:太阳能直放站 弱场区 铁路 应用试验 秦沈客运专线 数字集群通信系统
分 类 号:U285.44[交通运输工程—交通信息工程及控制] U285.7[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117