摘 要:对岭澳核电站硼回收系统蒸发器序列的功能和状态进行了描述。结合硼回收系统蒸发器序列的状态调试,给出了蒸发器序列状态调试的内容、调试期间用到的公式以及蒸发器序列正常启动至停止时所出现的状态参数曲线。针对蒸发器序列状态调试过程中出现的具体问题,分析了产生的原因并提出了处理措施。调试结果表明,硼回收系统蒸发器序列状态运行完全满足了系统设计要求。This paper describes the function and states of the evaporator unit of boron recycling system of Ling-ao Nuclear Power Plant. Based on the state commissioning of the evaporator unit of boron recycling system, the items for states commission, the formula used in the commissioning of evaporator unit, and the state parameter curves of the evaporator from normal starting-up to sequential stopping states are presented. The origin and corrective measures for the problems occurred during the commission are also presented in the paper. The commission shows that the operation of the evaporator unit of boron recycling system can fully meet the design requirement.
分 类 号:TL353.13[核科学技术—核技术及应用]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.44