蔺河口水电站碾压混凝土拱坝设计  被引量:4

Design of RCC arch dam of Linhekou Hydropower Station

在线阅读下载全文

作  者:蔡云鹏[1] 

机构地区:[1]西北勘测设计研究院,陕西西安710065

出  处:《水力发电》2004年第2期36-37,41,共3页Water Power

摘  要:蔺河口水电站大坝为碾压混凝土双曲拱坝。针对碾压混凝土大仓面快速连续上升的施工特点,大坝布置力求简单,大坝基础排水采取自流方式,不设集水井和爬坡廊道。应力计算考虑坝体混凝土温度未冷却到稳定温度场或准稳定温度场时拱坝蓄水工况,相应接缝灌浆设计具有重复灌浆功能,以保证大坝的运行安全。The Linhekou Hydropower Station has a RCC double-curvature arch dam.Considering the salient feature of large-batch,sucressive and rapid rising of RCC construction,and in pursuit of a simple dam layout,a gravity flow pattern was choosed for the drainage of the dam,foundation without sump and slope gallery. Such loading case as reservoir impounding before the RCC reaching its steady or quasi -steady temperature field shall be adopted in the stress computation,and the joint grouting of the dam was designed to be repeatable to assure a safe operation of the dam.

关 键 词:碾压混凝土双曲拱坝 温度荷载 诱导缝 重复灌浆 蔺河口水电站 

分 类 号:TV642[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象