检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]同济大学,上海200092
出 处:《结构工程师》2004年第2期51-56,74,共7页Structural Engineers
摘 要:本文用Drucker Prager模型和基于直接约束的接触算法模拟了超深嵌岩地下连续墙支护深基坑开挖全过程。模拟结果表明设置接触后计算结果更接近工程实测值 ,明显优于不设置接触情况 ;墙体嵌岩部分拉应力和压应力都很大 ;开挖至一定深度后 ,支护结构受力和变形变化不明显 ;考虑混凝土开裂和钢筋的加强作用对变形计算结果影响不大。所得出的结论为嵌岩基坑支护结构设计优化和施工控制提供了理论依据和实践参考。All thirteen excavation stages of a super deep foundation pit braced by rock-socketed diaphragm wall are simulated in this article using Drucker-Prager soil model and contact algorithm based on direct control method. FEM simulation results reveal that both tensional and compressive stress are very large at wall foot which is socketed into rock. Results also indicate that after having reached a certain depth,wall displacement and ground settlement change very little due to further excavation. Considering crack of concrete and reinforcing of rebar has little effect on calculated wall displacement and soil settlement. These conclusions provide theoretical basis and practical references for design optimization and construction control of such kind of deep pit.
分 类 号:U445.55[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145