水阳江中游南漪湖治理控制工程方案选定  被引量:5

The Scheme Selection of Improving and Controlling Projects for Nanyi Lake at Middle Reaches of Shuiyangjiang River

在线阅读下载全文

作  者:宦朝东 陆宗磐[2] 李中明[1] 

机构地区:[1]安徽省宣城市水务局 [2]中水北方勘测设计研究有限责任公司

出  处:《水利水电工程设计》2004年第2期1-2,13,共3页Design of Water Resources & Hydroelectric Engineering

摘  要:水阳江流域上游山区暴雨集中 ,洪峰流量大 ,经常超过中下游河道的安全泄量。按照流域规划要求 ,水阳江综合治理主要措施是上游建库蓄洪 ,中游建闸控制蓄洪 ,下游清障开卡。南漪湖是水阳江中游最大的调蓄湖泊。在北山河马山埠和双桥河口分别建闸控制洪水 ,同时封堵油榨沟河 ,是解决中游洪水的切实可行的、合理的工程方案。The storm rainfall is concentrated on the mountains at the upstream of Shuiyangjiang River catchment. The peak flood is so great that it often overpasses the safe discharge of middle and downstream river courses. According to the requirements of catchment planning, the main measures for improving Shuiyangjiang River comprehensively is to construct a reservoir and storage flood and the gate must be constructed at middle reach to control the flood and the obstacles at downstream will be cleared. Nanyi Lake is the biggest storage lake at the middle reach of Shuiyangjing River. The gates will be constructed at Hemashanfu on North Mountain and at the river mouth of Shuangqiao respectively to control the flood and this is a feasible and reasonable project scheme to solve the problem of flood at middle reaches.

关 键 词:水阳江流域 洪峰流量 蓄洪 控制工程 泄洪能力 

分 类 号:TV882[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象