500kV开关站构架改造工程的设计与施工  

Design and Construction for Renovation of 500 kV Switching Station Structures

在线阅读下载全文

作  者:范振中[1] 吴必华[1] 吴帆[1] 王宏 艾友忠 

机构地区:[1]中南电力设计院,武汉市430071 [2]长江电力有限公司,湖北省宜昌市443002

出  处:《电力建设》2004年第4期21-22,26,共3页Electric Power Construction

摘  要:葛洲坝水力发电厂开关站 ,5 0 0kV构架的改造工程系华中电网的重大技术改造项目 ,历时 5年 ,在不影响开关站安全运行的情况下 ,克服设计和施工现场的重重困扰 ,最终完成了构架柱加固、端撑及构架梁的改造 ,消除了构架结构的重大安全隐患 。The retrofitting project of 500 kV frames at the switch station of Gezhou Dam Hydraulic Power Plant is an important technical retrofitting project of the middle China Power Network, which has lasted for 5 years. The retrofitting project was implemented, including reinforcement of structural columns, end supporting and structural beams in conditions without effect on safe operation of switch station and overcoming difficulties in design and construction site. As a result, the significant safe hidden troubles in the carcass structure have been eliminated to ensure the safe and stable operation of the switch station.

关 键 词:葛洲坝水力发电厂 500kV开关站 构架改造工程 设计 施工 

分 类 号:TU745.7[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象