凌津滩水电站泄洪闸工作闸门及启闭机设计特点  被引量:2

Design features of flood-releasing service gate and hoist for Lingjintan Hydropower Station

在线阅读下载全文

作  者:虞喜泉[1] 袁长生[1] 

机构地区:[1]中南勘测设计研究院,湖南长沙410014

出  处:《水力发电》2004年第4期50-52,共3页Water Power

摘  要:凌津滩水电站首次采用大型盘香式启闭机启闭大型平面工作闸门,取消常规布置中的混凝土高排架,加快了工程进度,实现提前6个月发电,取得了非常好的经济效益与社会效益。自1998年下闸蓄水以来,泄洪闸已经安全运行了近5年时间,工作闸门及启闭机经历了各种洪水的考验,总体运行情况基本良好,可供类似工程借鉴。This paper outlines the first use of large disc-type hoist for operating the large plane gate of the Lingjintan Hydropower Station. In addition, the cancellation of concrete trestle stand usually on the concrete dam brought about a speed-up of construction progress and 6-month early first power generation as well as good economic and social benefits. During five-year operation since 1998, the flood-releasing gate and hoist have experienced all kinds of flood and maintained a safe and reliable operation, presenting a sound system operation. This paper summarizes the design features of the operating flood-releasing gate and hoist, which can use for reference for the colleagues in the work of the similar projects.

关 键 词:盘香式启闭机 平面工作闸门 凌津滩水电站 

分 类 号:TV34[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象