检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]贵州工业大学资源与环境学院,贵州贵阳550003 [2]安徽省石台房地产开发公司,安徽石台245100
出 处:《焦作工学院学报》2004年第2期131-135,共5页Journal of Jiaozuo Institute of Technology(Natural Science)
摘 要:针对某滑落填土边坡,在对其稳定性进行分析评价的基础上,采用恢复挡土墙并结合抗滑桩的方案进行支护.从原设计的挡土墙入手,采用反算法得出该挡土墙恢复后承担的临界土压力,再从桩、墙作用力的分摊效应方面考虑,应用抗滑桩的极限承载理论和绕流阻力理论及钢筋混凝土结构学知识进一步探讨了抗滑桩的合理设置,从而对该土质边坡,提出一套具有参考价值和针对性的边坡优化支护方案.Based on the stability evaluation of a destroyed filling slope, a method of slope treatment with recovering retaining wall and combination with stabilizing pile is presented.First, by means of reversing arithmetic, a critical soil pressure is deduced from the former retaining wall. Then, from sharing effect of stabilizing pile and retaining wall, discussion about retional setting of stabilizing pile has also been studied by applying the theory of ultimate bearing capacity and circle resistance and architectonic knowledge of armoured concrete. Accordingly, a set of pertinent optimum designing method has been proposed with some reference significance for this soil slope.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30