检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]清华大学,北京100084
出 处:《矿冶》2004年第2期71-74,共4页Mining And Metallurgy
基 金:国家"十五"重点项目(2001BA609A)
摘 要:提出了一种以车流规划目标流率饱和度为基础的露天矿卡车实时调度模型。它包括两个调度准则,可以在车流规划状态稳定时,最大限度地实现各道路的目标流率;在车流规划状态转换时,较快地实现车流的转移;还能对随机因素导致的特殊情况进行处理。它的静动态特性优良,生产均衡性好。文中将该模型与国外广泛采用的动态规划实时调度模型进行了比较,并以首钢水厂铁矿作为实例,对车流规划状态转换的过渡过程进行了仿真。This paper describes a truck real-time truck dispatching model for the strip mines,based on the truck flow saturation of the programming.The model including two dispatching rules can both realize the truck flow when the truck flow programming is steady or changed and weaken the effect of the random factors.The dispatching model has the excellent dynamic and equilibrium characteristics.This paper compares the model with the foreign dynamic programming model,and simulates the truck dispatching process when the truck flow programming is changed,based on the data of Shuichang iron mine.
分 类 号:TD571[矿业工程—矿山机电] TP391.9[自动化与计算机技术—计算机应用技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222