检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈建余
机构地区:[1]广州市水利局,广州510640
出 处:《岩石力学与工程学报》2004年第12期2027-2031,共5页Chinese Journal of Rock Mechanics and Engineering
基 金:教育部年轻骨干教师项目"降雨入渗对边坡稳定性影响研究"和南京市留学回国人员基金资助项目。
摘 要:针对工程实际存在的饱和-非饱和边坡岩体等计算域内有密集排水孔的问题,引入排水子结构技术,推导了相应的计算公式,并开发了相关的程序,同时也简介了降雨入渗和饱和-非饱和渗流逸出面的正确模拟问题。最后对长江三峡永久船闸边坡降雨入渗饱和-非饱和渗流场问题进行了求解,分析和论证了工程中的有关渗流控制情况。To the unsaturated-saturated seepage field with densely-distributed drainage holes existing in the computational domain,the drainage substructure is introduced. The involved formulae are deduced and the com-putation program is developed. Meanwhile,rainfall infiltration and precise simulation of the exit face of the satu-rated-unsaturated seepage are also introduced. Finally,the problem of the slope seepage field of the permanent shiplock of the Three Gorges Project is calculated. The effectiveness and propriety of the seepage control measures in the slope are analyzed and verified.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112