检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《岩石力学与工程学报》2004年第12期2065-2068,共4页Chinese Journal of Rock Mechanics and Engineering
摘 要:通过现场量测的深基坑围护结构变形信息资料,结合参数优化反分析及弹性地基梁有限元计算,建立了深基坑开挖中支护结构变形计算的预报方法。在开挖过程中,利用变形监测信息,优化反分析得出土体和支护结构的力学参数,再利用这些参数预报支护结构在下一工况的变形。该方法可对深基坑开挖的安全性作出评估,指导工程施工。An approach for predicting the displacement of the retaining structure of foundation pit is proposed based on in-situ data, optimum back analysis and elastic finite element method. With the monitoring information of displacement in the process of deep excavation, the optimum back analysis is used to calculate the properties of soils and retaining structure, which are then applied to predict the displacement of the retaining structure in the next stage. The back analysis is repeated in subsequent stages until the end of excavation. The results of back analysis provide guidance on design and construction of deep excavation and assessment on the security of excavation operation.
关 键 词:土木工程 深基坑 支护结构 优化反分析 变形预报 弹性地基梁
分 类 号:TU942[建筑科学—建筑技术科学] TU43
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30