检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:申艳[1] 伍鹤皋[1] 蒋逵超[1] 郭志兵[2] 杨志宏[2]
机构地区:[1]水资源与水电工程科学国家重点实验室,武汉大学湖北武汉430072 [2]四川省水利水电勘测设计研究院,成都610072
出 处:《中国农村水利水电》2004年第6期72-74,共3页China Rural Water and Hydropower
摘 要:结合紫坪铺水利枢纽工程的实际情况 ,采用三维有限元方法对该工程发电引水系统取消伸缩节的可行性进行了研究。计算结果表明 ,主厂房上游永久分缝处以一段垫层管代替常规伸缩节 ,结构位移和应力完全可以满足使用要求 ,从而达到了取消伸缩节。By integrating with the actual situation of Zipingpu Water Conservancy Project, feasibility study on replacing expansion joint in the hydropower project water diversion system is carried out by using three dimensional FEM. The results show that replacing conventional expansion joint by penstocks with cushion layer at the upper stream permanent joint of the main workshop can meet the requirements of structural displacement and stress. Thus, it is feasible to replace expansion joint thus to save the project cost.
分 类 号:TV731.5[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.147.211