紫坪铺水利枢纽引水系统取消厂前伸缩节研究  被引量:6

Study on the Replacing Expansion Joint in Water Diversion System in Zipingpu Water Conservancy Project

在线阅读下载全文

作  者:申艳[1] 伍鹤皋[1] 蒋逵超[1] 郭志兵[2] 杨志宏[2] 

机构地区:[1]水资源与水电工程科学国家重点实验室,武汉大学湖北武汉430072 [2]四川省水利水电勘测设计研究院,成都610072

出  处:《中国农村水利水电》2004年第6期72-74,共3页China Rural Water and Hydropower

摘  要:结合紫坪铺水利枢纽工程的实际情况 ,采用三维有限元方法对该工程发电引水系统取消伸缩节的可行性进行了研究。计算结果表明 ,主厂房上游永久分缝处以一段垫层管代替常规伸缩节 ,结构位移和应力完全可以满足使用要求 ,从而达到了取消伸缩节。By integrating with the actual situation of Zipingpu Water Conservancy Project, feasibility study on replacing expansion joint in the hydropower project water diversion system is carried out by using three dimensional FEM. The results show that replacing conventional expansion joint by penstocks with cushion layer at the upper stream permanent joint of the main workshop can meet the requirements of structural displacement and stress. Thus, it is feasible to replace expansion joint thus to save the project cost.

关 键 词:水电站厂房 伸缩节 垫层管 有限元法 

分 类 号:TV731.5[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象