检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐锦才[1] 张巍[1] 徐国君[1] 俞锋[1] 方华[1]
机构地区:[1]水利部农村电气化研究所,浙江杭州310012
出 处:《中国农村水利水电》2004年第6期78-79,共2页China Rural Water and Hydropower
摘 要:我国在 2 0世纪 70年代兴建的小水电站已运行了几十年 ,随着新技术与新材料的应用 ,对老电站进行增容改造 ,提高电站的调峰能力是提高电站和县电网经济效益的关键措施之一。介绍了机组增容改造的方法和实际应用中应注意的问题。The small hydropower stations built in 1970's have been operated for decades, so it is necessary to enlarge and reform the old power stations with the development of new techniques and new materials. Increase of the peaking capacity is one of the key measures to boost the economic benefits of the power stations and the electric networks at county level. In this paper, the unit capacity enlargement and reform methods are introduced, and the problems in the practical applications are also put forward.
分 类 号:TV742[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145