农村小水电站机组增容改造的方法  被引量:14

Methods of Small Hydropower Station Unit Capacity Enlargement and Reform in Rural Areas

在线阅读下载全文

作  者:徐锦才[1] 张巍[1] 徐国君[1] 俞锋[1] 方华[1] 

机构地区:[1]水利部农村电气化研究所,浙江杭州310012

出  处:《中国农村水利水电》2004年第6期78-79,共2页China Rural Water and Hydropower

摘  要:我国在 2 0世纪 70年代兴建的小水电站已运行了几十年 ,随着新技术与新材料的应用 ,对老电站进行增容改造 ,提高电站的调峰能力是提高电站和县电网经济效益的关键措施之一。介绍了机组增容改造的方法和实际应用中应注意的问题。The small hydropower stations built in 1970's have been operated for decades, so it is necessary to enlarge and reform the old power stations with the development of new techniques and new materials. Increase of the peaking capacity is one of the key measures to boost the economic benefits of the power stations and the electric networks at county level. In this paper, the unit capacity enlargement and reform methods are introduced, and the problems in the practical applications are also put forward.

关 键 词:小水电站 增容改造 水轮机 

分 类 号:TV742[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象