黄河某堤段堤身裂缝成因分析  被引量:3

Analysis of Cracks along Some Levees of Yellow River

在线阅读下载全文

作  者:吴伟功[1] 刘丰收[1] 李振灵[1] 李怀志 

机构地区:[1]黄河水利委员会勘测规划设计研究院,河南郑州450003 [2]焦作黄河河务局,河南焦作454002

出  处:《华北水利水电学院学报》2004年第2期26-28,共3页North China Institute of Water Conservancy and Hydroelectric Power

摘  要:黄河大堤在实施工程淤背后出现堤身裂缝,对裂缝出现的空间进行了研究,结合堤身土的性质及测试成果认为:历次的堤身加高、培厚,存在土质疏松、干密度低及压缩性高的特性,在后期淤背施工过程中,堤身土处于近饱和状态,土体浸水及排水后,由于堤身土的固结作用,引起堤身土的沉陷,因而产生纵向裂缝.建议对这一问题采用土桩挤密法处理.The cracks which occur along Yellow River abutment after the completion of artificial sedimentation. Based on laboratory est results, it is concluded that the earth which forms the abutment shows the characteristics of looseness, low density and high compressibility. The consolidation and settlement of saturated loose soil, which resulted from the artificial sedimentation, develops the cracks along the abutment. Some measures have been suggested to treat this geotechnical problem.

关 键 词:黄河大堤 淤背 堤身裂缝 

分 类 号:TV882.1[水利工程—水利水电工程] TV698.231

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象