1402(3)综采工作面压架原因分析  被引量:26

A Case Study of Support Break-off at 1402(3) Fully Mechanized Mining Face

在线阅读下载全文

作  者:熊晓英[1] 李俊斌[2] 

机构地区:[1]淮南职业技术学院,安徽淮南232001 [2]淮南矿业(集团)有限责任公司,安徽淮南232001

出  处:《中国煤田地质》2004年第3期34-37,共4页Coal Geology of China

摘  要:1402(3)回采工作面(缩小防水煤柱开采的首采面)在开采过程中,先后出现2次综采压架事故,通过对该面综采压架原因多角度的分析研究,认为在目前的装备条件和管理水平下,上提阶段工作面完全可以采用综采回采,为指导今后潘谢矿区上提阶段回采工作面的安全生产工作提供了依据。During the mining of 1402(3) production face (the first face of water prevention pillar reducing), two fully mechanized mining support break-offs were happened one after another. Through studies from different point of view on causation of the break-offs, the authors think under the current equipment condition and level of management, fully mechanized mining production can be used in above-mentioned stage working faces. Provide a basis of safety in production in above-mentioned faces in Panxie mining area.

关 键 词:综采压架 原因分析 缩小防水煤柱 1402(3)综采工作面 

分 类 号:TD327[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象