沈阳站主候车室整体改造施工技术  被引量:1

INTEGRAL RENOVATING TECHNOLOGY FOR WAITING ROOM OF SHENYANG RAILWAY STATION

在线阅读下载全文

作  者:赵振宇[1] 王冰[1] 周昆[1] 

机构地区:[1]沈阳铁路分局建筑工程总公司一公司,110000

出  处:《建筑技术》2004年第6期421-422,共2页Architecture Technology

摘  要:沈阳站主候车室始建于1908年,其砖木结构已不符合抗震及消防要求,需进行整体改造。将原内部结构体系全部拆除,用新增框架结构体系代替原砖木结构承担全部荷载。原外墙与框架合成整体,既保留了原貌,又满足了结构要求,扩大了使用面积,并改善了使用功能。Brick-and-timber structure of the main waiting room of Shenyang Railway Station built in 1908 could no longer meet the requirements of seismic and fire resistance. It must be therefore renovated entirely. The old internal structure system is dismantled; and new frame structure system is built to bear the whole load in replacement of the original brick -and -timber structure system. By combining the original external wall and the frame into a monolithic structure, it not only has the original looks preserved, but also satisfies structural requirement, enlarges usable floor area and improves operating function.

关 键 词:古旧建筑物 改造 托换技术 

分 类 号:TU746.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象