检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国网技术学院,山东济南 [2]国网湖北省咸宁供电公司,湖北咸宁
出 处:《电力与能源进展》2017年第1期1-6,共6页Advances in Energy and Power Engineering
摘 要:基于电子式互感器独立采样环节,建立电子式互感器至合并单元延时模型,提出一种改进的智能变电站线路纵联差动保护方法,建立合并单元精简电流数据扩展出口,不经本端保护装置直接远传三相电流数据至对端保护装置以降低电流数据处理延时。分析及实验证明,该方式可降低220 kV智能变电站纵联差动保护数据延迟2~3 ms。This paper presents a time delay evaluation method based on electronic transformer independent sampling. A time delay reduction method is proposed to decrease the time lag of the current data in the line longitudinal differential protection. It is in use of extended port of current merging unit and transmits the simplified current data to the other side of transmission line protection device directly. The analysis and test results show that the proposed method could reduce the time delay in 220 kV line longitudinal differential protections from 2 milliseconds to 3 milliseconds.
关 键 词:智能变电站 合并单元 线路纵联差动保护 电子式互感器
分 类 号:TM7[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33