检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袁羊扣[1] 刘爱军[1] 焦有权[1] 刘诚斌[1]
出 处:《土木工程》2018年第6期906-918,共13页Hans Journal of Civil Engineering
摘 要:本文以北京丰台区南苑乡南苑村某地块为研究背景,利用现场检测技术慢速维持荷载法分别对复合地基增强体的单桩以及单桩复合地基进行静载荷试验,对检测数据进行整理分析,得到本工程施做的CFG桩桩顶沉降量、桩Q-s曲线图及s-lgt曲线,并与数值模拟计算结果进行对比,结果表明:现场检测结果与数值计算结果基本上是一致的,判定该复合地基满足沉降要求。在模拟过程中发现适当增加桩体长度对复合地基承载力的提升具有一定的帮助,此结论可为类似工程提供参考。Based on the background of CFG reinforcement in Nanyuan Village, Fengtai District, Beijing, this paper studies on field test pile test of CFG pile composite foundation by numerical simulation and field test. Combined with the pile foundation detection technology, the results of the test data in-dicate that the CFG piles of this project meet the requirements. And then compared with the nu-merical simulation, the results show that the field test is basically the same as the numerical cal-culation results. In the course of simulation, it is found that increasing the length of piles properly is helpful to improve the bearing capacity of composite foundation, which can provide reference for similar projects.
分 类 号:U4[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145