检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙胜伟 黄欣[2] Shengwei Sun;Xin Huang(School of Civil Engineering, Tianjin University, Tianjin;Doctoral Research Center of China Railway Eighteen Bureau Group Co., Ltd., Tianjin)
机构地区:[1]天津大学,建筑工程学院,天津 [2]中铁十八局集团有限公司,博士后工作站,天津
出 处:《土木工程》2019年第1期13-20,共8页Hans Journal of Civil Engineering
摘 要:大体积混凝土在施工过程中,由于混凝土的量大,水泥的水化热热量大,在混凝土内外散热不均匀以及受到内外约束的情况下,混凝土内部易产生较大的温度应力,导致混凝土发生开裂。以南盘江特大桥工程的劲性骨架钢筋混凝土拱桥为依托,为防止拱座基坑大体积混凝土温度裂缝的产生,通过计算进行模拟混凝土浇注和水化的放热过程并布置散热管控制混凝土的温度。Due to the large amount of concrete, cement hydration heat and heat, uneven heat dissipation in the concrete inside and outside and under the conditions of internal and external constraints, large volume concrete in the construction process is easy to produce large temperature stress in the concrete resulting in concrete cracking. Based on the stiffened reinforced concrete arch bridge of the South Pan River special bridge project, the heat release process of simulated concrete pouring and hydration is calculated and the temperature of the concrete is controlled by the arrangement of the heat dissipation tube in order to prevent the formation of the large volume concrete temperature cracks in the arch foundation pit.
分 类 号:TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28