三塔斜拉桥上部结构施工监控技术  

Construction Monitoring Technology of Superstructure of Three-Tower Cable-Stayed Bridge

在线阅读下载全文

作  者:宋亚格 刘进 

机构地区:[1]华北水利水电大学土木与交通学院,河南 郑州 [2]中建交通建设集团有限公司河南分公司,河南 郑州

出  处:《土木工程》2024年第11期2091-2100,共10页Hans Journal of Civil Engineering

摘  要:斜拉桥施工控制是保证成桥达到理想受力状态的重要环节。本文以沣邑大桥为研究对象,模拟计算施工全过程并获得各施工阶段的理想状态,对索塔应力及线形、拉索索力、主梁应力及线形、大气及结构温度进行实时检测,通过实测结果分析与理论计算结果对比,分析施工误差状态并及时进行安全度评估及有效调整,保证结构的受力和变形始终处于安全的范围内,使成桥后的主梁线形与结构内力接近设计的理想状态。The construction control of cable-stayed bridge is an important link to ensure that the bridge reaches the ideal stress state. In this paper, the Fengyi Bridge is taken as the research object, the whole construction process is simulated and calculated, and the ideal state of each construction stage is obtained, and the stress and alignment of the cable tower, the cable force, the stress and alignment of the main beam, the atmosphere and the structural temperature are detected in real time, and the construction error state is analyzed through the comparison of the measured results and the theoretical calculation results, and the safety assessment and effective adjustment are carried out in time to ensure that the force and deformation of the structure are always within the safe range, so that the linear shape of the main beam and the internal force of the structure after the bridge is close to the ideal state of the design.

关 键 词:斜拉桥 施工监控 施工监控内容 施工监控方法 

分 类 号:U44[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象