某电厂贮灰坝渗流场研究  

Study on Seepage Field of Ash Storage Dam in a Certain Power Plant

在线阅读下载全文

作  者:苏宇磊 吴琦 

机构地区:[1]华北水利水电大学地球科学与工程学院,河南 郑州

出  处:《土木工程》2024年第12期2190-2198,共9页Hans Journal of Civil Engineering

摘  要:浸润线是尾矿坝安全关键控制因素之一,为分析某电厂贮灰坝渗流场状态及浸润线影响因素,采用GEO-Slope软件渗流模块,结合勘察资料和监测数据,选取最不利剖面模拟贮灰坝渗流场及影响坝体浸润线因素。结果表明:1) 在初期坝排渗设施失效,干滩长度50米以下时堆积坝不稳定。2) 贮灰坝浸润线的位置随着干滩长度的减小而上升,随着初期坝渗透系数的减小而上升。研究所得结论能够为电厂贮灰坝的渗流监测及控制提供一定的参考。The infiltration line is one of the key control factors for tailings dam safety. In order to analyze the seepage field status and influencing factors of the seepage line of a power plant’s ash storage dam, the GEO-Slope software seepage module was used. Combined with survey data and monitoring data, the most unfavorable profile was selected to simulate the seepage field of the ash storage dam and the factors affecting the seepage line of the dam body. The results indicate that: 1) In the initial stage, the dam drainage facilities fail, and the accumulation dam is unstable when the dry beach length is below 50 meters. 2) The position of the infiltration line of the ash storage dam increases with the decrease of the dry beach length and the decrease of the initial dam permeability coefficient. The conclusions drawn from the research can provide some references for the seepage monitoring and control of ash storage dams in power plants.

关 键 词:贮灰坝 渗流场 浸润线 

分 类 号:TN9[电子电信—信息与通信工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象