检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]宝山钢铁钢股份有限公司,上海
出 处:《矿山工程》2018年第1期25-30,共6页Mine Engineering
摘 要:宝钢原料场煤场E、F料条原为露天煤场,为了减少无组织扬尘、降低物料损耗、减少入炉煤含水量等,于2014~2016年期间进行了环保封闭改造,将物料贮存工艺由露天堆放更改为筒仓堆积。本文介绍了工程的内容和目标,并对改造期间的物流保障措施、施工难点和对策做了阐述。Baosteel coal yard used to be in the open air. In order to reduce dust, the loss of material and the moisture content of the coal etc., the closed renovation engineering was implemented in 2014~2016. The raw material storage process was changed from the open air to the silo cluster. In this paper, the content and target of this project are introduced, and the logistics guarantee measures and the construction difficulties and countermeasures are expounded.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.202