检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国网安徽省电力有限公司黄山供电公司,安徽 黄山 [2]上海久隆企业管理咨询有限公司,上海
出 处:《管理科学与工程》2023年第4期590-596,共7页Management Science and Engineering
摘 要:传统电网建设的成本管理方式,以控制采购成本为主。在电网长期运行环境下,追求安全、效能和成本三者的平衡关系,控制整体成本符合目标则更为重要。本文基于全生命周期管理理论,从电网主设备的成本归集和成本分析两个层面进行研究,以10 kV变压器作为典型案例,分析得出结论:购置费用和故障率是案例变压器全生命周期最主要的两项因素。The cost management approach in traditional power grid construction primarily focuses on controlling procurement costs. However, in the long-term operational context of the power grid, achieving a balanced relationship between safety, efficiency, and cost becomes even more important. This study is based on the theory of lifecycle management and investigates the cost assignment and cost analysis of the power grid primary equipment. Taking a 10 kV transformer as a typical case, the analysis concludes that acquisition cost and failure rate are the two most significant factors throughout the life cycle of the transformer.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.206.12