A2/O与A2/O + MBR工艺在新疆某污水厂中的运行效能对比  

Comparison of Operational Efficiency between A2/O and A2/O + MBR Processes in a Wastewater Treatment Plant in Xinjiang

在线阅读下载全文

作  者:张宇萌 楼强 吴一平 汪海洋 王维红[1] 

机构地区:[1]新疆农业大学水利与土木工程学院,新疆 乌鲁木齐 [2]新疆昆仑新水源河西水务有限责任公司,新疆 乌鲁木齐

出  处:《水污染及处理》2025年第1期1-8,共8页Water Pollution and Treatment

基  金:国家自然科学基金项目:基于好氧颗粒污泥系统的粒径与关联因素响应机制的高效调控体系构建(51968071)。

摘  要:A2/O + MBR工艺为A2/O工艺与MBR工艺的串联组合,利用了MBR膜池代替A2/O工艺中的二沉池,使其具有更小的占地面积和更加优质、稳定的出水水质保障。为了探究传统A2/O工艺及A2/O + MBR工艺在城镇污水处理中的应用效能,在同季节、同时段、进水均匀分配的条件下,比较分析了两种工艺在连续31 d中对污染物的降解效能。结果表明:A2/O + MBR工艺在处理城镇生活污水的效果上优于传统A2/O工艺,且抗冲击负荷能力更强,是更具优势的成熟工艺。A2/O工艺、A2/O + MBR工艺的平均处理成本分别为0.4702元/m3、0.6354元/m3,传统A2/O工艺运行成本比A2/O + MBR工艺低0.1652元/m3,相较之下更具经济性。The A2/O + MBR process is a series combination of A2/O process and MBR process. The MBR membrane tank is used to replace the secondary sedimentation tank in the A2/O process, so that it has a smaller floor area and better quality and stable effluent quality assurance. In order to explore the application efficiency of traditional A2/O process and A2/O + MBR process in urban sewage treatment, the degradation efficiency of pollutants by the two processes in 31 days was compared and analyzed under the condition of uniform distribution of water in the same season and at the same time. The results show that the A2/O + MBR process is superior to the traditional A2/O process in the treatment of urban domestic sewage, and the impact load resistance is stronger, which is a more advantageous mature process. The average treatment costs of theA2/O process and the A2/O + MBR process are 0.4702 yuan/m3 and 0.6354 yuan/m3, respectively. The operating cost of the traditional A2/O process is 0.1652 yuan/m3 lower than that of the A2/O + MBR process, which is more economical.

关 键 词:A2/O + MBR工艺 A2/O工艺 城镇污水处理 混合液污泥浓度 有机物去除率 

分 类 号:X70[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象