检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Nader Barsoum Nadira Zulkeffley Myjessie Songkin
出 处:《Energy and Power Engineering》2018年第6期301-318,共18页能源与动力工程(英文)
摘 要:An example of Sandakan power grid problem is presented in this paper. Sandakan is a suburb in east coast of Sabah state of Malaysia. Stability problem occurs due to the increase in load demand, lack of generation sources and inadequate supply. The tripping disturbances occur frequently in the network which is contributing to voltage instability. In this paper dynamics stability of 33 kV power grid as related to Sandakan network is analyzed and simulated. The analysis is completed by modelling the network data in Power System Simulation for Engineering (PSS/E) software and simulate the transient stability of generator, exciter and governor during a three phase fault occurs on a far and close distance from a bus, and determine the critical clearing time as well as swing curve of rotor angle. The output values of electrical power, machine speed, rotor angle and bus voltage are observed.An example of Sandakan power grid problem is presented in this paper. Sandakan is a suburb in east coast of Sabah state of Malaysia. Stability problem occurs due to the increase in load demand, lack of generation sources and inadequate supply. The tripping disturbances occur frequently in the network which is contributing to voltage instability. In this paper dynamics stability of 33 kV power grid as related to Sandakan network is analyzed and simulated. The analysis is completed by modelling the network data in Power System Simulation for Engineering (PSS/E) software and simulate the transient stability of generator, exciter and governor during a three phase fault occurs on a far and close distance from a bus, and determine the critical clearing time as well as swing curve of rotor angle. The output values of electrical power, machine speed, rotor angle and bus voltage are observed.
关 键 词:Transient Stability PSS/E Load Flow GENERATOR EXCITER GOVERNOR Critical CLEARING Time
分 类 号:TM7[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.140.23