Ultra-High Performance Concrete: An Advanced Solution for Accelerated Bridge Pier Cap Rehabilitation and Bearing Replacement  

Ultra-High Performance Concrete: An Advanced Solution for Accelerated Bridge Pier Cap Rehabilitation and Bearing Replacement

在线阅读下载全文

作  者:Atul Patil Atul Patil(Structures’ Department, HNTB Corporation, Cherry Hill, USA)

机构地区:[1]Structures’ Department, HNTB Corporation, Cherry Hill, USA

出  处:《Open Journal of Civil Engineering》2023年第3期427-442,共16页土木工程期刊(英文)

摘  要:The objective of this paper is to propose and illustrate feasibility, approach, validation as per prevailing codes and design standards, specification to rehabilitate bridge pier cap by using Ultra-High Performance Concrete (UHPC). The evaluation of existing pier caps and bearings indicates that the complete removal of existing bearing is undesirable due to 1) massive size of bearing 2) difficulty in cutting through the thick components of existing bearing 3) deeply anchored lower shoe of existing bearings 4) huge cost and time required to erect temporary support system for superstructure to facilitate the construction of new piers. To overcome these difficulties, UHPC could be cast around the lower shoe up to the existing bearing pin. This UHPC cast could be used to support jacks and temporary bearings. The new low height permanent bearing could then be installed after removing the upper shoe of the existing bearing. In the present research, first properties of UHPC are summarized followed by evaluation of case studies to check feasibility of the solution to rehabilitate pier cap by using UHPC. The complex load paths in pier cap are idealized by using validated strut and tie model as per prevailing AASHTO LRFD Bridge Design Specification.The objective of this paper is to propose and illustrate feasibility, approach, validation as per prevailing codes and design standards, specification to rehabilitate bridge pier cap by using Ultra-High Performance Concrete (UHPC). The evaluation of existing pier caps and bearings indicates that the complete removal of existing bearing is undesirable due to 1) massive size of bearing 2) difficulty in cutting through the thick components of existing bearing 3) deeply anchored lower shoe of existing bearings 4) huge cost and time required to erect temporary support system for superstructure to facilitate the construction of new piers. To overcome these difficulties, UHPC could be cast around the lower shoe up to the existing bearing pin. This UHPC cast could be used to support jacks and temporary bearings. The new low height permanent bearing could then be installed after removing the upper shoe of the existing bearing. In the present research, first properties of UHPC are summarized followed by evaluation of case studies to check feasibility of the solution to rehabilitate pier cap by using UHPC. The complex load paths in pier cap are idealized by using validated strut and tie model as per prevailing AASHTO LRFD Bridge Design Specification.

关 键 词:BRIDGE Pier Cap REHABILITATION Composition Bearing STRUT TIE AASHTO 

分 类 号:TU5[建筑科学—建筑技术科学]

 