Contractor-Related Factors and Performance of Bridge Construction Projects Implemented by Kenya National Highways Authority (KeNHA) Kenya  

Contractor-Related Factors and Performance of Bridge Construction Projects Implemented by Kenya National Highways Authority (KeNHA) Kenya

在线阅读下载全文

作  者:Joan Anyika Otike Charles Kabubo Victoria Okumu Joan Anyika Otike;Charles Kabubo;Victoria Okumu(Kenya National Highways Authority, Nairobi, Kenya;Jomo Kenyatta University of Agriculture and Technology, Nairobi, Kenya)

机构地区:[1]Kenya National Highways Authority, Nairobi, Kenya [2]Jomo Kenyatta University of Agriculture and Technology, Nairobi, Kenya

出  处:《Open Journal of Civil Engineering》2024年第2期214-224,共11页土木工程期刊(英文)

摘  要:The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This study aimed to bridge this gap by examining the effects of contractor-related factors on the performance of bridge construction projects in Kenya through a case study of the Bridge projects Implemented by the Kenya National Highway Agency (KeNHA). The theory of constraints (TOC) was adopted as its theoretical framework. Descriptive research was used, and the target population was 18 bridge construction projects, which were the units of analysis from 2012 to 2022. In each of these projects, 18 respondents, namely clients, consultants, contractors, engineers, environment and social guards, project managers, stakeholders, subcontractors, technical advisors, and inspectors, were included in a target population of 144 respondents. A census was conducted and a structured questionnaire was administered from which a response rate of 68% was achieved. The information was analyzed using descriptive, correlation, and multiple linear regression analysis. The contractor-related factors considered in the study were staff and management factors. The findings indicated that staff and management factors had a positive and significant outcome on performance of bridge construction projects. The study recommends continuous training and a safe learning environment for staff to improve their skills and performance in future projects. The study also recommends that a special category for bridge contractors be created in Kenya’s National Construction Authority rankings to ensure that only qualified contractors implement the Bridge projects.The performance of bridge projects in Kenya is poor in terms of completion by schedule, cost, and quality (scope). Yet, there is less evidence of empirical research on what factors contribute to this outcome. This study aimed to bridge this gap by examining the effects of contractor-related factors on the performance of bridge construction projects in Kenya through a case study of the Bridge projects Implemented by the Kenya National Highway Agency (KeNHA). The theory of constraints (TOC) was adopted as its theoretical framework. Descriptive research was used, and the target population was 18 bridge construction projects, which were the units of analysis from 2012 to 2022. In each of these projects, 18 respondents, namely clients, consultants, contractors, engineers, environment and social guards, project managers, stakeholders, subcontractors, technical advisors, and inspectors, were included in a target population of 144 respondents. A census was conducted and a structured questionnaire was administered from which a response rate of 68% was achieved. The information was analyzed using descriptive, correlation, and multiple linear regression analysis. The contractor-related factors considered in the study were staff and management factors. The findings indicated that staff and management factors had a positive and significant outcome on performance of bridge construction projects. The study recommends continuous training and a safe learning environment for staff to improve their skills and performance in future projects. The study also recommends that a special category for bridge contractors be created in Kenya’s National Construction Authority rankings to ensure that only qualified contractors implement the Bridge projects.

关 键 词:Staff Factors Management Factors Performance Bridge Projects KeNHA 

分 类 号:F42[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象