检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Zhen Wu Xuegang Wang Lihua Fang Qiuchen Gu Zhen Wu;Xuegang Wang;Lihua Fang;Qiuchen Gu(College of Systems Engineering, National University of Defense Technology, Changsha, China;Department of Aerospace Security, Space Engineering University, Beijing, China;College of Transportation Engineering, Dalian Maritime University, Dalian, China;The 31041 Unit of the Chinese People’s Liberation Army, Beijing, China)
机构地区:[1]College of Systems Engineering, National University of Defense Technology, Changsha, China [2]Department of Aerospace Security, Space Engineering University, Beijing, China [3]College of Transportation Engineering, Dalian Maritime University, Dalian, China [4]The 31041 Unit of the Chinese People’s Liberation Army, Beijing, China
出 处:《World Journal of Engineering and Technology》2023年第4期716-731,共16页世界工程和技术(英文)
摘 要:Currently, the comprehensive assessment of the communication troops’ camp planning project is primarily qualitative, with limited quantitative evaluation. Drawing upon the relevant spirit of the Military Commission’s documents and leveraging the author’s own work experience in branch offices, this article thoroughly explores the factors influencing the comprehensive assessment of the project and proposes quantitative representation methods for these factors. Utilizing the Analytic Hierarchy Process (AHP), a hierarchical structure model and judgment matrix for the evaluation factors of the communication troops’ camp construction planning project are constructed, enabling the determination of the weightage of each factor. This provides a certain level of support and reference for the project approval and management by branch offices, while also offering valuable insights for the approval and management of camp planning and construction projects in other types of troops and battlefield projects.Currently, the comprehensive assessment of the communication troops’ camp planning project is primarily qualitative, with limited quantitative evaluation. Drawing upon the relevant spirit of the Military Commission’s documents and leveraging the author’s own work experience in branch offices, this article thoroughly explores the factors influencing the comprehensive assessment of the project and proposes quantitative representation methods for these factors. Utilizing the Analytic Hierarchy Process (AHP), a hierarchical structure model and judgment matrix for the evaluation factors of the communication troops’ camp construction planning project are constructed, enabling the determination of the weightage of each factor. This provides a certain level of support and reference for the project approval and management by branch offices, while also offering valuable insights for the approval and management of camp planning and construction projects in other types of troops and battlefield projects.
关 键 词:Communication Corps Camp Infrastructure Planning Endeavor Determinative Elements Assessment Analytic Hierarchy Process (AHP)
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195