检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Baatarchuluun Enkhchuluun Bat-Ochir Batgerel Cao Ping Baatarchuluun Enkhchuluun;Bat-Ochir Batgerel;Cao Ping(School of Resources and Safety Engineering, Central South University, Changsha, China;Mining Institute, Mongolian University of Science and Technology, Ulaanbaatar, Mongolia)
机构地区:[1]School of Resources and Safety Engineering, Central South University, Changsha, China [2]Mining Institute, Mongolian University of Science and Technology, Ulaanbaatar, Mongolia
出 处:《International Journal of Geosciences》2023年第8期689-709,共21页地球科学国际期刊(英文)
摘 要:This study demonstrates a practical cycle time analysis of dump truck haulage system of “Ukhaa Khudag” open-pit coal mine located in Umnugobi Province, Mongolia. It examines the possibility of minimizing the cycle time of the haulage system as well as factors impacting the speed of the dump truck. The current study divides the open pit mine road for the dump trucks into five sections which are bench road, ramp, surface road, dump road uphill, and dump road. Meanwhile, it investigates the influence of the length, the grade, and the rolling resistance of the road section on the cycle time. The data is analyzed using mathematical regression methods via Microsoft Excel program. For each of the five road sections, we compare the statistical calculations of three regression models: linear, quadratic and exponential;thus, a total of thirty regression models are obtained in this research. Accordingly, the cycle time for each road section is predicted by the most accountable model. The loaded and empty direction of the movement is measured and calculated for each road section, and it appears that the difference between the calculated mean value and the actual cycle time of the models is 0.82 seconds with a relative error of 2.51 percent.This study demonstrates a practical cycle time analysis of dump truck haulage system of “Ukhaa Khudag” open-pit coal mine located in Umnugobi Province, Mongolia. It examines the possibility of minimizing the cycle time of the haulage system as well as factors impacting the speed of the dump truck. The current study divides the open pit mine road for the dump trucks into five sections which are bench road, ramp, surface road, dump road uphill, and dump road. Meanwhile, it investigates the influence of the length, the grade, and the rolling resistance of the road section on the cycle time. The data is analyzed using mathematical regression methods via Microsoft Excel program. For each of the five road sections, we compare the statistical calculations of three regression models: linear, quadratic and exponential;thus, a total of thirty regression models are obtained in this research. Accordingly, the cycle time for each road section is predicted by the most accountable model. The loaded and empty direction of the movement is measured and calculated for each road section, and it appears that the difference between the calculated mean value and the actual cycle time of the models is 0.82 seconds with a relative error of 2.51 percent.
关 键 词:Dump Truck Cycle Time Mine Haul Road Regression Analysis
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145