Feasibility of Transferring Drinking Water from the Senegal River in the East (Backel) to the West Center (Fatick) in Senegal  

Feasibility of Transferring Drinking Water from the Senegal River in the East (Backel) to the West Center (Fatick) in Senegal

在线阅读下载全文

作  者:Ndiouga Camara Alioune Ly Babacar Diouf Séni Tamba Ndiouga Camara;Alioune Ly;Babacar Diouf;Séni Tamba(UFR Engineering Sciences, Iba Der THIAM University of This, VCN, This, Sngal;Genie Cil Departement, Polytechnic School of This, This, Sngal;Polytechnic Institute of Saint Louis, Gaston Berger University of Saint Louis, Saint Louis, Sngal)

机构地区:[1]UFR Engineering Sciences, Iba Der THIAM University of This, VCN, This, Sngal [2]Genie Cil Departement, Polytechnic School of This, This, Sngal [3]Polytechnic Institute of Saint Louis, Gaston Berger University of Saint Louis, Saint Louis, Sngal

出  处:《Journal of Water Resource and Protection》2024年第11期720-729,共10页水资源与保护(英文)

摘  要:Every year, 24 billion m3 of fresh water are thrown into the sea by the Senegal River, while most of the country’s populations do not have permanent access to drinking water. Also, agricultural land, which extends as far as the eye can see, is only used during winter periods, thus slowing down the development of agriculture. It is in this context that this article studies the feasibility of transferring drinking water from the Senegal River in the east of the country to the center-west through a transfer canal to meet the drinking water needs of the populations. In addition, we intend to flood the fossil valleys from this canal and recharge the aquifers. The watershed resulting from the juxtaposition of the two watersheds which dominate central Senegal has a slightly descending profile from Bakel to Fatick. This promotes gravity flow of water over 542 km. This analysis is carried out by the Glabal Mapper software and SRTM1 images. We report that all water needs have been estimated at approximately 70 m3/s based on the ANDS census in 2023, the distribution of arable land and groundwater recharge areas in the country. The waters flowing in the canal have depths (draft) not reaching 4.6 m. These results are obtained by applying the Manning Strickler equation, on a channel with a straight cross-section in the shape of a trapezoid and lined with sand concrete. The canal thus designed will bring water to populations and arid zones in the central and central-western regions of the country where problems persist. However, it will be necessary to overcome a difference in altitude of 96 m over 30 km to raise the water from the river to the threshold of the canal in order to ensure the flow in the latter. We have retained two calculation variants (Canal + Pumping or Single Pumping) whose pumping stations will be powered by solar fields. Due to the heavy investments, the installations upstream of the canal will be modular over time. Consequently, the central canal project will be constructed in six (6) phases of ten (10) yEvery year, 24 billion m3 of fresh water are thrown into the sea by the Senegal River, while most of the country’s populations do not have permanent access to drinking water. Also, agricultural land, which extends as far as the eye can see, is only used during winter periods, thus slowing down the development of agriculture. It is in this context that this article studies the feasibility of transferring drinking water from the Senegal River in the east of the country to the center-west through a transfer canal to meet the drinking water needs of the populations. In addition, we intend to flood the fossil valleys from this canal and recharge the aquifers. The watershed resulting from the juxtaposition of the two watersheds which dominate central Senegal has a slightly descending profile from Bakel to Fatick. This promotes gravity flow of water over 542 km. This analysis is carried out by the Glabal Mapper software and SRTM1 images. We report that all water needs have been estimated at approximately 70 m3/s based on the ANDS census in 2023, the distribution of arable land and groundwater recharge areas in the country. The waters flowing in the canal have depths (draft) not reaching 4.6 m. These results are obtained by applying the Manning Strickler equation, on a channel with a straight cross-section in the shape of a trapezoid and lined with sand concrete. The canal thus designed will bring water to populations and arid zones in the central and central-western regions of the country where problems persist. However, it will be necessary to overcome a difference in altitude of 96 m over 30 km to raise the water from the river to the threshold of the canal in order to ensure the flow in the latter. We have retained two calculation variants (Canal + Pumping or Single Pumping) whose pumping stations will be powered by solar fields. Due to the heavy investments, the installations upstream of the canal will be modular over time. Consequently, the central canal project will be constructed in six (6) phases of ten (10) y

关 键 词:Fresh Water CANAL Fossil Valleys Aquifers The Dividing Line Watersheds Gravity Flow Sand Concrete Height Difference Modular Solar Fields 

分 类 号:P64[天文地球—地质矿产勘探]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象