检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交路桥建设有限公司海外分公司,北京 [2]中交第一公路勘察设计研究院有限公司,陕西 西安
出 处:《水资源研究》2020年第4期444-452,共9页Journal of Water Resources Research
摘 要:缺资料流域的水文计算是目前工程项目应用中的难点。本文在对Siran沿线水文资料的收集与分析基础上,并在实地调查测量获取河道特征水位的情况下,计算桥梁设计洪峰流量。小流域洪水暴涨暴落,历时短,很少能留下明显的痕迹,往往不会引起人们的注意,故难以调查到较为可靠的历史洪水资料,且没有水文站的观测资料。采用非连续水文观测资料推算法和暴雨推理公式计算法进行流量计算,结果表明暴雨推理公式计算法较合理,研究结果可用于指导本项目的桥梁设计,为巴基斯坦印度河流域水文计算提供了参考依据。The hydrological calculation in the scarce data basin is very difficult at present. Based on the collection and analysis of hydrological data along Siran, and on the condition that the characteristic water level of river channel is obtained through field survey, the design peak flow of local bridge of small watershed is calculated. The flood in small watersheds has a short period of time, leaving few obvious traces, which often does not attract people’s attention. Therefore, it is difficult to investigate more reliable historical flood data, and there is no observation data from hydrological stations. The calculation method of discontinuous hydrological observation data and the rainstorm rational formula are used to design peak discharge. The results show that the rainstorm rational formula is more reasonable and suitable for the bridge design of the project. The research results can provide a reference for the hydrological calculation of Indus River Basin in Pakistan.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.91