三峡工程蓄水运行后新江口水沙特性变化分析  

Changes of Hydrodynamics and Sediment Transport at Xinjiangkou after Impounding of the Three Gorges Project

在线阅读下载全文

作  者:王琴 谢静红 

机构地区:[1]长江水利委员会水文局荆江水文水资源勘测局,湖北 荆州

出  处:《水资源研究》2021年第5期491-499,共9页Journal of Water Resources Research

摘  要:三峡工程蓄水运行后,随着出库泥沙大幅减少,造成下游水流挟沙能力处于不饱和状态,改变了原有河道特性及冲淤变化条件,水文站测验受到不同程度的影响。本文以荆江三口之一,松滋新江口水文站为例,通过蓄水前后新江口站附近河段断面冲淤变化,测站水沙变化特征分析,表明三峡工程蓄水运行后,新江口站水文断面有一定的冲刷,断面分流比变化不大而分沙比有逐年增加的趋势。After the operation of the Three Gorges Reservoir (TGR), the sediment carrying capacity in the downstream flow is in an unsaturated state due to clear water release, which changes the scour and silt characteristics of the original channel. The west branch of Songzi River was selected to analyze the change of scouring and siltation at Xinjiangkou cross-section. The results show that after the impoundment of TGR, the water diversion ratio is changed a little while the sediment diversion ration is increasing annually at the Xinjiangkou cross-section.

关 键 词:三峡工程 清水下泄 断面冲淤 水沙变化 

分 类 号:TV1[水利工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象