检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖南省水利水电勘测设计规划研究总院有限公司,湖南 长沙 [2]武汉大学水资源工程与调度全国重点实验室,湖北 武汉 [3]湖南省水利厅,湖南 长沙 [4]长沙理工大学水利与环境工程学院,湖南 长沙
出 处:《水资源研究》2024年第5期512-519,共8页Journal of Water Resources Research
摘 要:沅江流域水资源丰富,通过水库群联合优化调度能够发挥较大潜力。本文根据沅江流域特性,以最大削峰准则为目标,考虑最大下泄流量、水电机组最大出力、生态基流等约束条件,构建了沅江流域水库群防洪调度模型。在保证水库工程安全的前提下,进行了不同洪水条件下的联合防洪调度研究。研究结果表明,相比于常规调度,优化调度具有以下优势:1) 在调度期动用等量防洪库容的情况下,托口、凤滩和五强溪水库的削峰率分别增加了15.4%、22.8%和14.7%;2) 优化调度最高水位低于常规调度最高水位,既有效保障了下游防洪安全,也减轻了水库上游城镇农田的淹没损失,实现了防洪效益的最大化。Yuanjiang River basin is rich in water resources, which can be maximumly used through joint optimization of reservoir group scheduling. In this paper, a flood control scheduling model of reservoirs in the Yuan River basin was constructed according to the characteristics of the basin, taking the maximum peak reduction criterion as the objective and considering the constraints such as maximum discharge flow, maximum output of hydropower units, and ecological base flow. Under the premise of ensuring the safety of the reservoir projects, a joint flood control scheduling study was carried out under different flood conditions. The results show that compared with the conventional dispatching, the joint and optimal dispatching has the following advantages: 1) The peak-clipping rate of the Tuokou, Fengtan and Wuqiangxi Reservoirs have increased 15.4%, 22.8% and 14.7%, respectively, when an equal amount of flood control storage capacity is utilized during the dispatching period;2) The maximum water levels of the optimized dispatching are lower than that of conventional dispatching, which can effectively guarantee the safety of downstream flood control and reduce the inundation loss of farmland in the upstream of the reservoirs, thus achieve the maximization of flood
分 类 号:TV6[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145