RESCHEDULING

作品数:28被引量:62H指数:4
导出分析报告
相关领域:自动化与计算机技术更多>>
相关期刊:《High-Speed Railway》《Frontiers of Engineering Management》《自动化学报》《Computer Systems Science & Engineering》更多>>
相关基金:国家自然科学基金国家重点基础研究发展计划中国博士后科学基金浙江省自然科学基金更多>>
-

检索结果分析

结果分析中...
选择条件:
  • 期刊=Chinese Quarterly Journal of Mathematicsx
条 记 录,以下是1-2
视图:
排序:
Rescheduling to Minimize Total Completion Time Under a Limit Time Disruption for the Parallel Batch被引量:1
《Chinese Quarterly Journal of Mathematics》2015年第2期274-279,共6页XU Xiao-yan MU Yun-dong GUO Xiao HAO Yun 
Supported by the National Natural Science Foundation of China(11271338, 11201121, 71201049); Supported by the National Natural Science Foundation of Henan Province(112300410078); Supported by the Natural Science Foundation of the Education Department of Henan Province(2011B110008)
In the rescheduling on a single machine, a set of the original jobs has already been scheduled, in order to make a given objective function is optimal. The decision maker needs to insert the new jobs into the existing...
关键词:RESCHEDULING single machine parallel batch time disruptions 
Rescheduling Problems with Bicriteria被引量:3
《Chinese Quarterly Journal of Mathematics》2009年第3期349-356,共8页慕运动 
Supported by the NSFC(10671183);Supported by the Science Foundation of Henan University of Technology(07XJC002);Supported by the NSF of the Education Department of Henan Province(2008A11004);Supported by the NSF of Henan Province(082300410190)
In the rescheduling on a single machine,a set of original jobs has already been scheduled to minimize some cost objective,when a new set of jobs arrives and creates a disruption.The decision maker needs to insert the ...
关键词:RESCHEDULING hierarchical optimization time disruption sequence disruption single machine 
检索报告 对象比较 聚类工具 使用帮助 返回顶部