supported by the National Basic Research Program of China(‘‘973’’Program,No.2013CB035906);Foundation for Innovative Research Groups of the National Natural Science Foundation of China(No.51621092);Heilongjiang Provincial Major Scientific and Technological Project of Applied Technology Research and Development Plan(No.GA14A501)
Previous studies at home and abroad have mainly focused on single dam-break, and little attention has been paid so far to the dam-break of cascade reservoirs. Multi-source flooding, which can lead to three-dimensional...
supported by the Foundation for Innovative Research Groups of National Natural Science Foundation of China(No.51321065);the Foundation for Key Program of Natural Science Foundation of High Arch Dam(No.51339003);the National Basic Research Program of China(‘‘973’’Program,No.2013CB035904)
Sequence placement logic plays a significant role in construction simulation of high arch dams and directly affects the simulation process and results. To establish a sequence logic for dam block placement, the constr...