INFEASIBILITY

作品数:8被引量:10H指数:2
导出分析报告
相关作者:黄志孙璐更多>>
相关机构:华中科技大学东南大学更多>>
相关期刊:《Science China Mathematics》《Chinese Journal of Chemical Engineering》《Journal of Southeast University(English Edition)》《海外英语》更多>>
相关基金:国家自然科学基金国家重点基础研究发展计划中国博士后科学基金霍英东教育基金更多>>
-

检索结果分析

结果分析中...
选择条件:
  • 期刊=Journal of Southeast University(English Edition)x
条 记 录,以下是1-1
视图:
排序:
Infeasibility test algorithm and fast repair algorithm of job shop scheduling problem
《Journal of Southeast University(English Edition)》2011年第1期88-91,共4页孙璐 黄志 张惠民 顾文钧 
The US National Science Foundation (No. CMMI-0408390, CMMI-0644552);the Research Fellowship for International Young Scientists (No. 51050110143);the Fok Ying-Tong Education Foundation(No. 114024);the Natural Science Foundation of Jiangsu Province (No.BK2009015);the Postdoctoral Science Foundation of Jiangsu Province (No.0901005C)
To diagnose the feasibility of the solution of a job-shop scheduling problem(JSSP),a test algorithm based on diagraph and heuristic search is developed and verified through a case study.Meanwhile,a new repair algori...
关键词:INFEASIBILITY job shop scheduling repairing algorithm 
检索报告 对象比较 聚类工具 使用帮助 返回顶部