The National Key Technology R&D Program of China during the 11th Five-Year Plan Period(No.2006BAH02A06)
A real-life milk run system designing problem of an engine manufacturer adopted JIT(just-in-time)production is studied.In the process of milk run system planning and design,the supply base is identified and a supplier...