SCHEDULE

作品数:329被引量:308H指数:7
导出分析报告
相关领域:自动化与计算机技术更多>>
相关作者:汤卫平宋宝燕于戈郭迪王玺更多>>
相关机构:清华大学北京航空航天大学南京航空航天大学国防科学技术大学更多>>
相关期刊:更多>>
相关基金:国家自然科学基金国家重点基础研究发展计划中国博士后科学基金北京市自然科学基金更多>>
-

检索结果分析

结果分析中...
选择条件:
  • 期刊=China Chemical Reporterx
条 记 录,以下是1-9
视图:
排序:
Accident Put off Startup of Urea Project in Chongqing
《China Chemical Reporter》2009年第10期12-12,共6页
Twelve workers were killed in an accident happened at theconstruction site of the 800 000 t/a urea project that ChinaNational Chemical Engineering Third Construction CompanyLimited is constructing for Chongqing Jianfe...
关键词:CHONGQING suddenly TOWER ACCIDENT SCHEDULE constru 
Elimination of HCFCs in Polyurethane Rigid Foam Sector Faces Challenges
《China Chemical Reporter》2009年第Z1期30-30,共6页Liu Weidong 
Schedule for eliminatingHCFCs is tightenedThe environmental problem has become afocus of attention in various countries ofthe world in recent years. At the 19th con-ference of signatories of the "Montreal Pro-tocol on...
关键词:SCHEDULE TOCOL MONTREAL SCHEDULE ELIMINATION moret 
Sanmu Strengthens Epoxy Resins Business
《China Chemical Reporter》2008年第36期10-10,共4页
Jiangsu Sanmu Group announced on November 27th at the 10 anni-versary operation ceremony of Jiangmen Sanmu Chemical Co.,Ltd.its target to annually produce
关键词:CEREMONY annually Jiangsu thousand RESINS SCHEDULE 
CNOOC's Penglai 19-3 Oil Field Phase Ⅱ Came on Stream
《China Chemical Reporter》2008年第29期15-15,共4页
On September 16th,2008 CNOOC an-nounced that Platform B of Phase Ⅱ of Peng Lai(PL) 19-3 in Shandong province came on stream successfully ahead of schedule.Phase Ⅱ of PL 19-3 includes five well-head platforms,a centr...
关键词:SHANDONG AHEAD SCHEDULE FLOATING currently oilfiel 
Guizhou Hongfu Gains Approval for Phosphorus Mine
《China Chemical Reporter》2008年第3期13-13,共4页
The project schedule on developing the second phase of Wengfu Phosphorus Mine handed by Guizhou Hongfu Industry Group was approved recently by the governmental
关键词:GUIZHOU approved governmental handed SCHEDULE fina 
BZ 34-1 Starts Production Ahead of Schedule
《China Chemical Reporter》2008年第2期11-11,共4页
On December 25th,2007 CNOOC Limited announced that Bo Zhong(BZ)34-1,an oilfield in Bohai Bay,had successfully come on stream ahead ofschedule.More than 4800 barrels of oil per day are produced from 7
关键词:SCHEDULE AHEAD OILFIELD Bohai wholly OWNED 
China CAMC Awards US$33 MLN Contract
《China Chemical Reporter》2007年第29期9-9,共2页
China CAMC Engineering Co.,Ltd(SZ:002051)hassigned a project business contract with the TyreRubber Industry Department,the Second IndustryMinistry of Burma,valued at US$33 million.Under the contract,China CAMC Enginee...
关键词:CONTRACT BURMA SCHEDULE radial VALUED 戴燕 
1.0 Billion M3/A Natural Gas Project in Daniudi Completed Ahead of Schedule
《China Chemical Reporter》2005年第35期12-12,共1页
On Nov. 4 a ceremony for the summaryand commendation of the first-phase1.0 billion m^3/a natural gas project inDaniudi Gasfield was held by Sinopecat the first station of the Dayu gas trans-mission pipeline located in...
关键词:SCHEDULE CEREMONY pipeline transmitted 
PROJECT NEWS
《China Chemical Reporter》2005年第33期13-14,共1页
Lucite International Opens MMA Plant in Shanghai Lucite International announced that its new methyl methacrylate (MMA) plant located in Caojing, Shanghai was completed ahead of schedule, and is now available at full c...
关键词:completed CUSTOMER facility AHEAD EXPAND attracting METHACRYLATE OPPORTUNITY SCHEDULE methanol 
检索报告 对象比较 聚类工具 使用帮助 返回顶部