相关期刊:《Protection and Control of Modern Power Systems》《Energy and Power Engineering》《Journal of Modern Power Systems and Clean Energy》《High Voltage》更多>>
Statistics shows that transients produced by lightning or momentary links with external objects, have produced more than 80% of faults in overhead lines. Reclosing of circuit breaker (CB) after a pre-defined dead time...