supported by National Basic Research Program of China(973 Program)Grant No.2011CB013503;China Three Gorges Corporation research project(Contract number:WDD/0490)
During concrete dam construction,concrete temperature monitoring and control is key to ensuring dam concrete quality and construction safety.In this study,a 2D thermal field restructuring method relating to the Krigin...
supported by the Innovative Research Groups of National Natural Science Foundation of China(No. 51621092);National Basic Research Program of China ("973" Program, No. 2013CB035904);National Natural Science Foundation of China (No. 51439005)
During the storehouse surface rolling construction of a core rockfilldam, the spreading thickness of dam face is an important factor that affects the construction quality of the dam storehouse' rolling surface and the...
supported by the National Basic Research Program of China(973 Program,Grant No.2012CB417000)
Full operation of the Three Gorges Dam(TGD) reduces flood risk of the middle and lower parts of the Yangtze River Basin. However,Dongting Lake, which is located in the Yangtze River Basin, is still at high risk for po...
supported by the National Basic Research Program of China ("973" Program) (Grant No. 2007CB714103);the National Natural Science Foundation of China (Grant No. 90815024)
In this study,a numerical model,which can capture the full process of the development of seepage passages,the collapse of dams and the failure due to overtopping,is proposed for earth-rock dams.The critical incipient ...
National Key Basic Research Program of China(973 Program),No.2011CB403302;National Natural Science Foundation of China,No.40971161;No.41071182
To study the influences of terraced field construction and check-dam siltation on soil erosion of a watershed, we built a simplified watershed model for the Loess Plateau hilly-gully region including terraced fields, ...
the National Basic Research Program of China(973 Program, Grant No. 2003CB415203);the National Natural Science Foundation of China (Grant No.50579054).
1-D and 2-D mathematical models for dam break flow were established and verified with the measured data in laboratory. The 1-D and 2-D models were then coupled, and used to simulate the dam break flow from the reservo...
Supported by the National Natural Science Foundation of China for Distinguished Young Scholars (Grant No. 50525927);the National Basic Research Program of China (973 Program) (Grant No. 2007CB714101)
Construction simulation for high rockfill dam (CSHRD) is the technology that takes advantage of computer simulation to observe and analyze a complex construction process, which is useful for construction design and ma...
Supported by the National Natural Science Foundation of China (Grant No. 50539030); the National Basic Research Program of China (973 Program) (Grant No 2007CB714104)
High tensile stresses occurred in high concrete dams and in their foundation lead to the growing importance of their safety with the increase of concrete dam height. Without any exiting specification or successful exp...