This work was supported by grants from Science and Technology Major Project of Anhui Province(17030901034);Jiangsu Key Research and Development Plan(BE2017067).
Wall-climbing robots can work on steep terrain and obtain environment information in three dimensions for human in real time,which can improve operation efficiency.However,traditional single-mode robots cannot ensure ...
This research paper describes an SEE (Structural Engineering Encounter) Lab project. The paper reports on the development of a single-story, single-bay portal frame model as part of the AIMS2 (attract, inspire, men...
In Mexico, owing to solar radiation conditions, there is great potential for PV (photovoltaic) systems. Besides, since 2007, the solar electricity interconnection agreement became official which allowed for an impor...
Technical process and pressure control system of coke furnace were introduced.The mathematical model based on experimental method of gas-collector pressure wasproposed.To a certain extent, it is more reliable and depe...