Supported by the National Natural Science Foundation of China(11475183);the Key Research Program of Frontier Sciences,CAS,(Y7292610K1)
The process e+e-→J/ψ+X with the center-of-mass(CM)energy in the range from 3.7 to 10.6 GeV is calculated up to the next-to-leading order(NLO)in quantum chromodynamics(QCD).At 10.6 GeV,the result is consistent with t...
Supported by Ministry of Education and Science of the Russian Federation and Russian Federal Agency for Atomic Energy
We discuss recent measurements of exclusive e^+e^- cross sections for charmed hadron final states near threshold performed by Belle and BABAR. The results are based on a study of events with initial-stateradiation ph...
Supported by Russian Foundation of Basic Research (09-02-08413-3)
Experimental data from the PEP-II B-factory at 10.6 GeV center-of-mass (c.m.) energy, obtained via initial-state radiation (ISR) with the BABAR detector, are presented. The cross sections for many hadronic process...
We present a precise BABAR measurement on the cross section of the process e^+e^- →π^+π^-(γ) from threshold to an energy of 3 GeV with the initial state radiation (ISR) technique, using 232 fb^-1 of data col...
National Natural Science Foundation of China(10775142)and 100 Talents Program of CAS(U-25)
The cross sections for e^+e^- →π^+ π^-J/ψ, π^+π^-ψ(2S), K^+K^-J/ψ, DD1D^0D1-π^+ +c.c., D^*D+c.c., and D^*D^* are measured using data sample collected on or near the T(4S) resonance with the Bell...
To meet the requirements of developing SFRFQ and upgrading the 1 MeV ISR RFQ accelerator,an ECR O^+ ion source and LEBT system have been developed.Using two Einzel Lenses to focus the beam,more than 3mA O^+ beam with ...
This paper presents new beam test results for O^+ beam on a high current Integral Split Ring Radio Frequency Quadruple(ISR RFQ)accelerator.After the upgrading,a new designed 2.45GHz O^+ ECR Ion Source can provide a be...
A new linear accelerating structure SFRFQ was proposed to transfer the RFQ inter-vane voltage to the inter-longitudinal accelerating gap voltage so as to improve the acceleration efficiency.A SFRFQ prototype is being ...
An ECR O^+ ion source and LEBT system have been developed for the upgrade of 1MeV Integral Split Ring RFQ at Peking University.To satisfy the requirement of RFQ,a more than 10mA oxygen beam has been extracted at 22kV ...